Folgen
Natashia L Boland
Natashia L Boland
Bestätigte E-Mail-Adresse bei isye.gatech.edu
Titel
Zitiert von
Zitiert von
Jahr
Flight string models for aircraft fleeting and routing
C Barnhart, NL Boland, LW Clarke, EL Johnson, GL Nemhauser, ...
Transportation science 32 (3), 208-220, 1998
5311998
The capacitated multiple allocation hub location problem: Formulations and algorithms
J Ebery, M Krishnamoorthy, A Ernst, N Boland
European journal of operational research 120 (3), 614-631, 2000
4472000
A hybrid algorithm for the examination timetabling problem
LTG Merlot, N Boland, BD Hughes, PJ Stuckey
Practice and Theory of Automated Timetabling IV: 4th International …, 2003
2962003
Improved preprocessing, labeling and scaling algorithms for the weight‐constrained shortest path problem
I Dumitrescu, N Boland
Networks: An International Journal 42 (3), 135-153, 2003
2942003
Accelerated label setting algorithms for the elementary resource constrained shortest path problem
N Boland, J Dethridge, I Dumitrescu
Operations Research Letters 34 (1), 58-68, 2006
2682006
LP-based disaggregation approaches to solving the open pit mining production scheduling problem with block processing selectivity
N Boland, I Dumitrescu, G Froyland, AM Gleixner
Computers & Operations Research 36 (4), 1064-1089, 2009
2322009
Preprocessing and cutting for multiple allocation hub location problems
N Boland, M Krishnamoorthy, AT Ernst, J Ebery
European Journal of Operational Research 155 (3), 638-653, 2004
2292004
The continuous-time service network design problem
N Boland, M Hewitt, L Marshall, M Savelsbergh
Operations research 65 (5), 1303-1321, 2017
2032017
A strengthened formulation and cutting planes for the open pit mine production scheduling problem
A Bley, N Boland, C Fricke, G Froyland
Computers & Operations Research 37 (9), 1641-1647, 2010
1632010
A multistage stochastic programming approach to open pit mine production scheduling with uncertain geology
N Boland, I Dumitrescu, G Froyland
Optimization online, 1-33, 2008
1362008
Minimizing beam‐on time in cancer radiation treatment using multileaf collimators
N Boland, HW Hamacher, F Lenzen
Networks: An International Journal 43 (4), 226-240, 2004
1332004
A criterion space search algorithm for biobjective integer programming: The balanced box method
N Boland, H Charkhgard, M Savelsbergh
INFORMS Journal on Computing 27 (4), 735-754, 2015
1182015
Algorithms for the weight constrained shortest path problem
I Dumitrescu, N Boland
International Transactions in Operational Research 8 (1), 15-29, 2001
1072001
Exact procedures for solving the discrete ordered median problem
N Boland, P Domínguez-Marín, S Nickel, J Puerto
Computers & Operations Research 33 (11), 3270-3300, 2006
1052006
A matheuristic for the multivehicle inventory routing problem
C Archetti, N Boland, M Grazia Speranza
INFORMS Journal on Computing 29 (3), 377-387, 2017
992017
Solving shortest path problems with a weight constraint and replenishment arcs
OJ Smith, N Boland, H Waterer
Computers & Operations Research 39 (5), 964-984, 2012
952012
New integer linear programming approaches for course timetabling
N Boland, BD Hughes, LTG Merlot, PJ Stuckey
Computers & Operations Research 35 (7), 2209-2233, 2008
942008
The L-shape search method for triobjective integer programming
N Boland, H Charkhgard, M Savelsbergh
Mathematical Programming Computation 8, 217-251, 2016
912016
Comparison of mixed-integer programming and genetic algorithm methods for distributed generation planning
JD Foster, AM Berry, N Boland, H Waterer
IEEE transactions on power systems 29 (2), 833-843, 2013
892013
A new method for optimizing a linear function over the efficient set of a multiobjective integer program
N Boland, H Charkhgard, M Savelsbergh
European journal of operational research 260 (3), 904-919, 2017
822017
Das System kann den Vorgang jetzt nicht ausführen. Versuchen Sie es später erneut.
Artikel 1–20